EV charging in Goa — the official route

The Department of New and Renewable Energy is responsible for administration of the 2021 policy.

Official policy · Government of Goa · High · verified 2026-07-31 · confirm: Yes - confirm current designation · [GA-EV-2021-001]

The policy states an operative period of five years from Gazette notification.

Official policy · Government of Goa · High · verified 2026-07-31 · confirm: Yes · [GA-EV-2021-001]

The State policy objective is a charging station every 25 km on highways and every 3 km within city limits.

Official policy · Government of Goa · High · verified 2026-07-31 · confirm: Yes - implementation · [GA-EV-2021-001]

Private and public EV charging stations must follow Government of India protocols and later notified protocols.

Official policy · Government of Goa · High · verified 2026-07-31 · confirm: Yes - current standards set · [GA-EV-2021-001]

Specified new or renovated buildings with more than 10 equivalent car spaces are intended to have at least 20% EV-ready spaces with conduits.

Official policy · Government/local bodies · High · verified 2026-07-31 · confirm: Yes · [GA-EV-2021-001]

Housing and commercial establishments are directed by policy to register charging installations with GED and designated parking spaces.

Official policy · GED/Government of Goa · High · verified 2026-07-31 · confirm: Yes · [GA-EV-2021-001]

DNRE and GED are to establish a working group for accelerated charging-infrastructure rollout.

Official policy · Government of Goa · High · verified 2026-07-31 · confirm: Yes · [GA-EV-2021-001]

Policy support identifies electricity-infrastructure cost support up to INR 8 lakh and a 20% capital subsidy for solar-powered charging stations.

Official policy · Government of Goa · High · verified 2026-07-31 · confirm: Yes · [GA-EV-2021-001]

For FY 2026-27 LTEV-I has a fixed charge of ₹25/kVA-month and energy charge of ₹5.45/kVAh.

Official tariff · JERC · High · verified 2026-07-31 · confirm: Yes - additions · [GA-TARIFF-2025-001]

For FY 2026-27 HTS-VI has a demand charge of ₹120/kVA-month and energy charge of ₹4.75/kVAh.

Official tariff · JERC · High · verified 2026-07-31 · confirm: Yes - additions · [GA-TARIFF-2025-001]

Public and captive EV charging up to 150 kW/167 kVA is covered by LTEV-I and may take three-phase LT supply.

Official tariff · JERC · High · verified 2026-07-31 · confirm: Yes - portal route · [GA-TARIFF-2025-001]

Charging a consumer's own EV at its premises is billed under the premises category rather than the dedicated EV category.

Official tariff · JERC · High · verified 2026-07-31 · confirm: Yes - actual use · [GA-TARIFF-2025-001]

Electricity used for office restaurant restroom convenience-store or other facilities at an EV charging station is billed at the non-domestic category.

Official tariff · JERC · High · verified 2026-07-31 · confirm: Yes - metering arrangement · [GA-TARIFF-2025-001]

GED's portal routes LT new connections up to 90 kW and HT new connections above 90 kW and offers load change forms tracking and document upload.

Official utility guidance · GED · High · verified 2026-07-31 · confirm: Yes - reconcile EV LT threshold · [GA-GED-PORTAL-WEB-001]

Retail tariff for the Electricity Department, Goa is determined by the Joint Electricity Regulatory Commission for Goa and Union Territories for the 4th multi-year tariff control period FY 2025-26 to FY 2029-30, by order dated 30 September 2025, which also trues up FY 2023-24. Goa is regulated by the joint commission rather than by a state commission of its own.

Official requirement · Joint Electricity Regulatory Commission for Goa and Union Territories · High · verified 2026-08-13 · confirm: Yes - the EV-category rate has not yet been extracted from this order · [GA-TARIFF-2025-001]

Low Tension tariffs in Goa apply to consumers with connected or contracted demand up to 100 kVA / 85 kW / 114 HP, expressly EXCEPT Electric Vehicle Charging Stations. Electric Vehicle Charging Stations up to 150 kW / 167 kVA shall avail supply at three phase. EVCS therefore enjoy a higher LT ceiling than other consumer categories in Goa.

Official requirement · Joint Electricity Regulatory Commission for Goa and Union Territories · High · verified 2026-08-13 · [GA-TARIFF-2025-001]

'EV Charging Stations' is a distinct consumer category in the Electricity Department Goa tariff structure, listed under 'Other Categories' alongside single-point supply and railway traction, and is carried through the Commission's category-wise sales and revenue tables.

Official requirement · Joint Electricity Regulatory Commission for Goa and Union Territories · High · verified 2026-08-13 · confirm: Yes - the EVCS rate itself has not been extracted; see the open question · [GA-TARIFF-2025-001]

Standard voltage of supply is set by contracted load, with EV charging stations given their own bands: an EV Charging Station with contracted load exceeding 5 kW and up to and including 167 kVA (150 kW) takes 3-phase 4-wire supply at 440 V (low tension), while all other installations are limited to 100 kVA of contracted load at low tension. An EV Charging Station with contracted load above 167 kVA (150 kW) and up to 5,000 kVA takes high tension at 6.6 kV, 11 kV, 22 kV or 33 kV, and contracted load above 5,000 kVA takes extra high tension at 66 kV and above.

Official requirement · Joint Electricity Regulatory Commission for the State of Goa and Union Territories · High · verified 2026-08-14 · [GA-SC-AMD3-2024-001]

Timelines for releasing a new connection or additional load where supply can be provided from the existing network, from receipt of an application complete in all respects: within 3 days in metro cities, 7 days in urban and municipal areas, 15 days in rural areas, and 30 days in rural areas of islands. Where extension works, enhancement of transformer capacity, extension of distribution mains or commissioning of a new substation is required, the licensee shall supply immediately after such extension or commissioning and within a period not exceeding 90 days.

Official requirement · Joint Electricity Regulatory Commission for the State of Goa and Union Territories · High · verified 2026-08-14 · [GA-SC-AMD3-2024-001]

If a distribution licensee fails to supply electricity within the period specified in the Supply Code Regulations it is liable to a penalty not exceeding five hundred rupees for each day of default.

Official requirement · Joint Electricity Regulatory Commission for the State of Goa and Union Territories · High · verified 2026-08-14 · [GA-SC-AMD3-2024-001]

An applicant may submit the connection application in hard copy or by electronic means; where a hard copy is submitted it must be scanned and uploaded, and an acknowledgement carrying the registration number must be issued within 24 hours of receipt of a complete application. Applications for new connections up to 10 kW must carry a photograph of the applicant, identity proof, and proof of ownership or occupancy of the premises; above 10 kW and for modifications, further documents apply. Where an agreement between licensee and consumer is required it forms part of the application and no separate agreement is needed.

Official requirement · Joint Electricity Regulatory Commission for the State of Goa and Union Territories · High · verified 2026-08-14 · [GA-SC-AMD3-2024-001]

No connection shall be given without a meter, and that meter must be a smart pre-payment meter or a pre-payment meter; any exception requires the Commission's approval with recorded justification. After a smart meter is installed no penalty may be imposed on the consumer for maximum demand recorded before the installation date. Where maximum demand recorded by the smart meter exceeds the sanctioned load in a month, that billing cycle is calculated on the actual recorded maximum demand and the consumer must be informed by SMS or mobile application, with sanctioned-load revision following where the recorded demand has exceeded the sanctioned limit at least three times in a financial year.

Official requirement · Joint Electricity Regulatory Commission for the State of Goa and Union Territories · High · verified 2026-08-14 · [GA-SC-AMD3-2024-001]

Who regulates and supplies in Goa

Authority typeAuthorityRoleOfficial portalSource
RegulatorJoint Electricity Regulatory Commission for Goa and UTsTariff and electricity regulationhttps://jercuts.gov.in/[GA-TARIFF-2025-001]
Distribution utilityElectricity Department Government of GoaSupply connection metering billing and network workshttps://www.goaelectricity.gov.in/[GA-GED-PORTAL-WEB-001]
Policy nodal agency / administratorDepartment of New and Renewable EnergyAdministration and nodal coordination under the 2021 EV policyhttps://www.goa.gov.in/[GA-EV-2021-001]
Implementation supportGoa Energy Development AgencyConcessional locations and policy implementation roleshttps://geda.goa.gov.in/[GA-EV-2021-001]
Electrical inspectorateElectrical Inspectorate Government of GoaHT/DTC/other inspection and commissioning approvals as triggeredhttps://www.goaelectricity.gov.in/general-information/electrical-inspectorate-procedures-forms/[GA-GED-EODB-WEB-001]
Local approvalCompetent municipality/panchayat/fire/building/road authorityParcel-specific land building fire access signage and road approvalsVaries by parcel[GA-EV-2021-001]

Which DISCOM serves your site in Goa

Utility allocation is indicative. Confirm the exact division and service point from the full site address before applying.
District / regionLikely utilityBasisMust confirmSource
GED is the public distribution department and publishes the area directoryConfirm exact O&M division/subdivision and section[GA-GED-AREA-WEB-001]
Official division/subdivision listConfirm parcel and nearest service number[GA-GED-AREA-WEB-001]
Official division/subdivision listConfirm parcel and subdivision[GA-GED-AREA-WEB-001]
Official division/subdivision listConfirm parcel and subdivision[GA-GED-AREA-WEB-001]
Official division/subdivision listConfirm parcel and subdivision[GA-GED-AREA-WEB-001]
Directory distinguishes EHV functions from consumer O&MObtain written lead office and voltage-feasibility route[GA-GED-AREA-WEB-001]

Fees, deposits and timelines in Goa

Values marked indicative or variable are not official quotations.
ItemValueBasisWhenCaveatSource
LTEV-I fixed charge₹25/kVA-monthOfficialFY 2026-27Public/captive EV charging[GA-TARIFF-2025-001]
LTEV-I energy charge₹5.45/kVAhOfficialFY 2026-27Add FPPCAS and statutory charges[GA-TARIFF-2025-001]
HTS-VI demand charge₹120/kVA-monthOfficialFY 2026-27Confirm billing demand and voltage[GA-TARIFF-2025-001]
HTS-VI energy charge₹4.75/kVAhOfficialFY 2026-27Add FPPCAS and statutory charges[GA-TARIFF-2025-001]
FPPCAS/duty/taxAdditional at current ratesOfficial variableEach billing periodObtain live GED bill stack[GA-TARIFF-2025-001]
Infrastructure supportUp to ₹8 lakhOfficial policy statementEligible installation if a live scheme existsNo financing credit without written sanction[GA-EV-2021-001]
Solar charging capital subsidy20%Official policy statementEligible solar-powered station if liveConfirm eligible base cap window and budget[GA-EV-2021-001]
Security deposit/service line/augmentationOfficial estimate requiredOpenNew/enhanced connectionNo universal project value captured
Connection timelineCurrent route-specific schedule requiredOpenComplete applicationCheck linked timeline and project network scope[GA-GED-EODB-WEB-001]
Inspectorate fee/timelineWritten confirmation requiredOpenTriggered HT/DTC/other installationUse current form/fee notice[GA-GED-EODB-WEB-001]

What is still unconfirmed in Goa

Published deliberately. These are the points we have not been able to verify from a primary source, and what we would confirm before advising on a site.

Go deeper

EV Charging Tariff in Goa1 entry · read the full pageEV Charging Connection Process in Goa5 entries · read the full pageEV Charging Safety Approvals in Goa2 entries · read the full pageEV Charging Subsidies in Goa1 entry · read the full pageEV Charging Connection Forms in Goa8 entries · read the full page