EV Infra Advisory

HomeToolsOpportunity Index › Ward 22 Chaitanyapuri, Medchal–Malkajgiri

EV charging opportunity in Ward 22 Chaitanyapuri, Medchal–MalkajgiriResearch beta

Car charging screening · urban area · on NH-65

94Relative score
92Demand
32Supply gap
85Feasibility
31Data confidence
What a score of 94 actually means. Scores are rescaled across all 21,813 cells in Telangana, so some cell always approaches 100. This is the size of the modelled demand-minus-supply gap here relative to everywhere else — not a measure of absolute demand, utilisation, or return.

What the data says here

Modelled car demand here is high, but public charging is already present nearby. Grid and access indicators are comparatively favourable.

The analysis cell covering Ward 22 Chaitanyapuri, Medchal–Malkajgiri is 0.76 km² with an uncertainty radius of ±0.53 km, centred on 17.3793, 78.5380. That is an area centroid, not a recommended plot — the model resolves an area of this size and does not identify parcels.

Existing public charging within 5 km

OperatorStationDistanceRecord confidence
StatiqTelephone Colony EV Charging Station1.6 kmC
StatiqM/s. RAMANTHAPUR FLG. STN2.1 kmC
StatiqSaroorngar GHMC Circle Office Backside2.3 kmC
StatiqRTA Nagole track Charging Station2.3 kmC
Tata Power EV Charging SolutionsCroma, Ramanthapur2.4 kmC
StatiqAmberpet Police line Charging Station2.4 kmC
StatiqGLIDA HMR Nagole2.5 kmC
Tata Power EV Charging SolutionsTata Motor_Select Car_Alkapuri_Hyderabad2.6 kmC

…and 28 more.

Operators present: Statiq (29), Tata Power EV Charging Solutions (4), Reliance BP Mobility (2), Bolt.Earth (IN) (1).

Charger power is imputed for roughly 98% of these records, so treat any capacity figure as an estimate rather than a specification. Private and captive chargers do not appear at all.

Measured electricity consumption nearby

The nearest metered EV-charging locality in the TGSPDCL data is Uppal, 3.6 km away. In August 2024 it drew 3,916 kWh across 1 billed connection(s), against 54 kW of sanctioned load.

This is measured, not modelled — the only such figure on this page. It confirms charging genuinely happens in this part of the city, but it describes a billing locality rather than this exact area, and one connection may feed several chargers.

Electric bus services on this corridor

Bus charging is a captive depot-and-terminus load contracted to an operator, not walk-in forecourt demand. A corridor carrying e-buses signals a counterparty worth approaching, not passing traffic that will fill your guns.

What still needs verifying

Open Ward 22 Chaitanyapuri, Medchal–Malkajgiri in the interactive index Score a specific site here

Other shortlisted areas in this segment